Discuss your project

Rooftop solar for
garment factories.

Large roofs, long daytime shifts and growing buyer expectations on energy make RMG factories one of the strongest fits for rooftop solar in Bangladesh.

Why solar fits
garment production.

Your demand peaks when the sun does

Sewing lines, lighting and fans run through the day shift, so most of what the roof produces can be used on site instead of being exported.

Buyers are asking about energy

Many international apparel brands now ask suppliers to report energy use and reduce emissions. On-site solar gives you a measurable answer to put in front of them.

Less exposure to tariff changes

Every unit generated on your roof is a unit you do not buy from the grid or produce with diesel, whatever those prices do next.

What we check
on a factory roof.

A factory roof has to work for solar for twenty years or more. These are the points a proper survey covers before any design is final.

Roof structure and age

Steel sheds need checks on purlins, sheet condition and fixings. RCC roofs need a load and waterproofing review. If sheets are near the end of their life, replacing them first can be the right call.

Shading and usable area

Water tanks, stair rooms, chimneys and neighbouring buildings all cast shade. We map what is left and design around it.

Generator and grid connection

Most factories run a generator alongside the grid. The system needs the right controls so solar works safely with both and never back-feeds the generator.

Export or self-consumption

Whether surplus can be exported under Bangladesh’s net metering arrangements depends on your connection. If not, the system is sized to what the factory uses itself.

Fire safety and access

DC isolation, cable routing, walkways and roof access are planned to fit your building’s fire and safety requirements, including any inspections your buyers require.

From a conversation
to a working solar system.

Listen & review

Share your site, electricity use and what you want solar to achieve for your business.

Survey & design

Assess the rooftop and develop a system plan around the site’s conditions.

Propose & agree

Review the equipment, installation scope, cost assumptions, warranties and support arrangements.

Install & support

Complete the agreed installation and handover, with a clear route to after-sales support.

Common
questions.

Will solar replace our grid supply or generator?

No. Rooftop solar works alongside them. It covers part of your daytime demand; the grid and generator cover the rest, and all of the night.

Will installation stop production?

Most of the work happens on the roof. Connecting to your electrical system needs a short planned shutdown, which can usually be scheduled for a weekend or an off shift.

Can we install on more than one building?

Yes. Many factories spread one system across several roofs. The survey looks at each roof separately and how they connect.

What should we prepare for the first conversation?

Recent electricity bills (ideally the last 12 months), your sanctioned load, the site address and, if you have them, roof or building drawings. Photos of the roof also help.

Let’s talk
about your rooftop.

Tell us a little about your business and where you want to begin.

01736-095759WhatsApp: 01736-095759Shadbi100@gmail.com
Moon Complex, 2nd Floor
10/11 Wise Ghat Road, Patuatuli
Dhaka, Bangladesh

We use these details only to reply to your enquiry.

WhatsApp us